6.1 20C102L/EIA/RE – Full application for the erection of 13 wind turbines comprising of 9 900kw wind turbines with a maximum hub height of up to 55m, rotor diameter of up to 52m and a maximum upright vertical tip height of up to 79m, and 4 900kw wind turbines with a maximum hub height of up to 54m, rotor diameter of up to 52m, and a maximum upright vertical tip height of up to 70m, together with the creation of crane pads, foundations, underground electricity cables, improvements to parts of the existing track, works to the highway, the creation of new access tracks, an extension to the existing 33kv substation, the erection of a new 11kv substation, the erection of an anemometer and temporary construction and storage compounds and batching plant (which would also entail the de-commissioning of the existing wind farm) at Rhyd y Groes Wind Farm, Rhosgoch

 

DEFERRED IN ORDER TO REARRANGE A SITE VISIT

 

6.2 30C561/FR/TR – Full application for the erection of a Zorb Centre together with the construction of a vehicular access and car park on land at The Lodge, Holyhead Road, Menai Bridge

 

DEFERRED

 

Publication date: 06/04/2016

Date of decision: 06/04/2016

Decided at meeting: 06/04/2016 - Planning and Orders Committee