No. | Item |
---|---|
Apologies Minutes: Apologies as noted above. |
|
Declaration of Interest Minutes: No declaration of interest received. |
|
To submit, for confirmation and signature, the minutes of the Planning and Orders Committee held on 8th January, 2014. Minutes: The minutes of the previous meeting of the Planning and Orders Committee held on 8 January, 2014 were presented and confirmed as correct. |
|
Site Visits None to be considered by this meeting. Minutes: None were considered at this meeting. |
|
Public Speaking Minutes: No public speaking at this meeting. |
|
Applications that will be Deferred PDF 665 KB 6.1 14C135A – Glasfryn, Tyn Lon 6.2 37C187 – Bryn Garth, Brynsiencyn 6.3 41C125B/EIA/RE – Bryn Eryr Uchaf, Menai Bridge 6.4 42C114A – Tai’n Coed, Pentraeth 6.5 44C294B – Plas Newydd, Rhosybol Minutes: 6.1 14C135A – Full application for the erection of a dwelling and private garage, creation of a new vehicular access together with the installation of a package treatment plant on land adjacent to Glasfryn, Tyn Lon
It was RESOLVED to defer consideration of the application in accordance with the Officer’s recommendation for the reason given in the written report.
6.2 37C187 – Outline application with some matters reserved for the erection of a dwelling, together with alterations to the existing access on land adjacent to Bryn Garth, Brynsiencyn
The Planning Development Manager stated that the Planning and Orders Committee at its meeting held in December 2013 had resolved to defer consideration of the application in order to explore whether the proposal could be considered under the exceptions site policy as a affordable dwelling. No response had been received by the applicant to date. Members considered that the applicant should be informed that the application will be dealt with at the next meeting if no response has been received.
It was RESOLVED to defer consideration of the application in accordance with the Officer’s recommendation for the reason given in the written report.
6.3 41C125B/EIA/RE – Full application for the erection of three 800kW – 900kW wind turbines with a maximum hub height of up to 55m, rotor diameter of up to 52m and a maximum upright vertical tip height of up to 81m, the improvements to the existing access to the A5025 road together with the erection of 3 equipment housing cabinets on land at Bryn Eryr Uchaf, Menai Bridge
It was RESOLVED to defer consideration of the application in accordance with the Officer’s recommendation for the reason given in the written report.
6.4 42C114A – Outline application for the erection of an agricultural dwelling together with the installation of a septic tank at Tai’n Coed, Pentraeth
It was RESOLVED to defer consideration of the application in accordance with the Officer’s recommendation for the reason given in the written report.
6.5 44C294B – Full application for the erection of two 20kW wind turbines with a maximum hub height of 20.5m, a rotor diameter of 13.1m and a maximum vertical upright height of 27.1m on land at Plas Newydd, Rhosybol
It was RESOLVED to defer consideration of the application in accordance with the Officer’s recommendation for the reason given in the written report. |
|
Applications Arising None to be considered by this meeting. Minutes: None considered at this meeting. |
|
Economic Applications None to be considered by this meeting. Minutes: None considered at this meeting. |
|
Affordable Housing Applications None to be considered by this meeting. Minutes: None considered at this meeting. |
|
Departure Applications None to be considered by this meeting. Minutes: None considered at this meeting. |
|
Development Proposals Submitted by Councillors and Officers None to be considered by this meeting. Minutes: None considered at this meeting. |
|
Remainder of Applications PDF 1 MB 12.1 11C607 – Dinorben Square, Amlwch 12.2 23C309A – Bron Haul, Talwrn 12.3 34LPA991/CC – 44-52 Bryn Meurig, Llangefni 12.4 34LPA991A/CC – 53-62 Bryn Meurig, Llangefni 12.5 46C263M – Ty’n Towyn Caravan Park, Lôn St. Ffraid, Trearddur Bay 12.6 47C102A – Clwchdernog Bach, Llanddeusant Minutes: 12.1 11C607 – Full application for the change of use of existing building from public toilets into a catering unit at Dinorben Square, Amwlch
The application was brought to the attention of the Planning and Orders Committee as part of the land is in Council ownership.
Councillor K.P. Hughes proposed that the application be approved and Councillor Nicola Roberts seconded the proposal.
It was RESOLVED to approve the application in accordance with the Officer’s recommendation, subject to the conditions contained within the report.
12.2 23C309A – Outline application with all matters reserved for a detached single storey dwelling and garage on land adjoining Bron Haul, Talwrn
The application was brought to the attention of the Planning and Orders Committee at the request of Councillor R.G. Parry OBE as a Local Member.
Councillor Nicola Roberts, a Local Member, stated that the application site is outside the boundary of the village of Talwrn and is adjacent to 12 other dwellings. She considered that this application would be an in-fill and identified as a cluster. The applicant is a Welsh speaker and the approval of this application would be a benefit to a small community similar to Talwrn to protect the Welsh language. The application conforms with Policy 50 as it would not impede on the amenities of the area. Councillor Roberts referred to the Highways Authority’s objection to the application as the road junction is substandard. She noted that there are 6 other dwellings and a business that use this junction; she was of the opinion that one other dwelling would not increase traffic use substantially. Councillor Nicola Roberts proposed that the application be approved and Councillor Vaughan Hughes seconded the proposal.
The Senior Engineer (Development Control) stated that the private road leading to the site is served by a substandard road junction and visibility onto the public highway is only 5 to 10m. The Officer suggested that the applicant should consider another access to the site.
Councillor Jeff Evans proposed that the application be refused and Councillor Ann Griffith seconded the proposal.
It was RESOLVED to refuse the application in accordance with the Officer’s recommendation, subject to the conditions contained within the report.
12.3 34LPA991/CC – Full application for the erection of a porch and security door at 44-52 Bryn Meurig, Llangefni
The application was brought to the attention of the Planning and Orders Committee as the application is on Council owned land.
Councillor Ann Griffith proposed that the application be approved and Councillor Lewis Davies seconded the proposal.
It was RESOLVED to approve the application in accordance with the Officer’s recommendation, subject to the conditions contained within the report.
12.4 34LPA991A/CC – Full application for the erection of a porch and security door at 54-62 Bryn Meurig, Llangefni
The application was brought to the attention of the Planning and Orders Committee as the application is on Council owned land.
Councillor K.P. Hughes proposed that the application be approved and Councillor Nicola Roberts seconded the proposal.
It was RESOLVED to approve ... view the full minutes text for item 12. |
|
13.1 38C277B – Caerdegog Uchaf, Llanfechell Minutes: 13.1 38C277B – Full application for the erection of a 50kW wind turbine with a maximum hub height of up to 24.6m, rotor diameter of up to 19.2m and a maximum upright vertical tip height of up to 34.2m and associated works on land at Caerdegog Uchaf, Llanfechell
It was RESOLVED to note the report for information. |
|
(1) To report that the County Council upon consideration of the above had resolved as follows :-
· ‘To support the convening of some meetings (Planning and Orders Committee and the two Scrutiny Committees) at 4.00 p.m., and 4.30 p.m., and that arrangements be discussed with the Chairs and Members of the relevant Committees and that an update report be presented to the next scheduled meeting of the Council on 27th February, 2014;
· To note the findings of the initial equality impact assessment;
· That arrangements be piloted for a period of 12 months commencing in April 2014.’
(2) To submit the report of the Interim Head of Democratic Services.
(3) To give consideration to the above.
Minutes: (1) Reported – that the County Council upon consideration of the above had resolved as follows :-
· ‘To support the convening of some meetings (Planning and Orders Committee and the two Scrutiny Committees) at 4.00 p.m., and 4.30 p.m., and that arrangements be discussed with the Chairs and Members of the relevant Committees and that an update report be presented to the next scheduled meeting of the Council on 27th February, 2014;
· To note the findings of the initial equality impact assessment;
· That arrangements be piloted for a period of 12 months commencing in April 2014.’
(2) Submitted and noted – report by the Interim Head of Democratic Services.
It was RESOLVED unanimously that the Planning and Orders Committee should continue to commence at 1.00 p.m.
|