Decision details

Applications Arising

Decision Maker: Planning and Orders Committee

Decision status: Recommendations Approved

Is Key decision?: No

Is subject to call in?: No

Decision:

7.1  16C119B – Full application for the erection of a building to provide a workshop and office at Pen yr Orsedd, Engedi

 

It was RESOLVED to reaffirm the decision to approve the application, contrary to the Officer’s recommendation, with an additional condition that the workshop and office will be for the applicant’s own use as a carpenter.

 

7.2 39C385D – Full application for the erection of 17 dwellings on land at Lôn Gamfa, Menai Bridge

 

It was RESOLVED to approve the application in accordance with the Officer’s recommendation, subject to the conditions contained within the report.

 

7.3 46C147D – Retrospective application for the use of paddock as a touring caravan site and retention of two containers used as a toilet and shower block, the use of land and retention of hardstanding for the commercial storage of caravans, boats and trailers, the residential use of a single touring caravan and retention of portacabin used as an office together with the replacement of the existing septic tank with a new sewerage treatment plant and soakaway at Tan y Graig, Trearddur Bay

 

It was RESOLVED to approve the application in accordance with the Officer’s recommendation, subject to the conditions contained within the report, together with an additional condition that the access to the site be widened.

 

7.4 46C247K/TR/EIA/ECON –  A hybrid planning application proposing: Outline with all matters reserved except for means of access, for : A leisure village at Penrhos Coastal Park, London Road, Holyhead comprising: up to 500 new leisure units including new lodges and cottages; Central new hub building comprising reception with leisure facilities including indoor sub-tropical water park, indoor sports hall and cafes, bars, restaurants and retail; Central new Farmer’s Market building; Central new spa and leisure building; A new café and water sports centre at the site of the former Boathouse; Demolition of the Bathing House and the construction of a restaurant at its former location; Demolition of other existing buildings including three agricultural barns and three residential dwellings; Providing and maintaining 29 hectares of publicly accessible areas with public car parking and enhancements to the Coastal Path, including: Managed walkways within 15 hectares of woodland, the retention and enhancement of Grace’s Pond, Lily Pond, Scout’s pond with viewing platforms, the Pet Cemetery, War Memorial, the Pump House and picnic area with bird feeding stations and hides with educational and bilingual interpretation signage created throughout; Creation of a new woodland sculpture trail and boardwalks and enhanced connection to the Coastal Path; the beach will continue to be accessible to the public providing safe access to the shallow shelving water; A Combined Heat and Power Centre Land at Cae Glas: The erection of leisure village accommodation and facilities which have been designed to be used initially as a temporary construction workers accommodation complex for Wylfa B at land at Cae Glas, Parc Cybi, Holyhead comprising : Up to 315 lodges which will be initially sub-divided for nuclear workers accommodation; Central hub building providing reception and canteen ancillary to accommodation; A Park and Ride facility comprising up to 700 car parking spaces; a new hotel; A lakeside hub comprising restaurant, café, retail and bar; New grass football pitch and cricket pitch; and a Combined Heat and Power Centre. To be subsequently converted (post Wylfa B construction) into an extension to the Penrhos Coastal Park Leisure Village comprising: Refurbished lodges and facility buildings to create high quality holiday accommodation (up to 315 family lodges); A Visitor Centre and Nature Reserve allowing controlled public access; and Heritage Centre with visitor parking. Land at Kingsland: the erection of a residential development which has been designed to be used initially as temporary construction workers’ accommodation at land at Kingsland, Kingsland Road, Holyhead comprising: Up to 360 new houses to be initially used as temporary construction workers’ accommodation. To be subsequently converted (post Wylfa B construction) into a residential development comprising: Up to 360 residential dwellings set in high quality landscaping and open spaces. Each phase of development will have ancillary development comprising car parking, servicing areas, open spaces and plant. Full detail for the change of use of the existing Estate building at Penrhos Coastal Park, London Road, Holyhead including the change for :The Bailiffs Tower and outbuildings at Penrhos Home farm from a cricket clubhouse to a visitors’ information centre, restaurant, café, bars and retail; Home Farm Barn and Cart Buildings from farm buildings to cycle and sports hire centre; the Tower from residential to a Manager’s accommodation and ancillary office; and Beddmanarch House from residential to a visitors’ centre – Penrhos Coastal Park, Cae Glas and Kingsland, Holyhead.

 

It was RESOLVED to approve the application in accordance with the Officer’s recommendation and to note that the application will be referred to the Welsh Government for a period of 21 days in accordance with The Town and Country Planning (Notification)(Wales) Direction 2012 with a recommendation that the local planning authority are minded to permit the planning application subject to :-

·        The applicant entering into a Section 106 Agreement, the draft heads of terms of which are set out in the Original Report.

·        Planning conditions covering the matters set out in the Original Report.

That the Head of Planning Services be granted delegated authority to negotiate the terms of the Section 106 Agreement and deal with the matters noted above by condition or Section 106 as is considered appropriate by the Head of Planning Services.

Publication date: 22/11/2013

Date of decision: 06/11/2013

Decided at meeting: 06/11/2013 - Planning and Orders Committee

Accompanying Documents: