Issue - decisions

Applications that will be Deferred

11/07/2014 - Applications that will be Deferred

6.1   41C125B/EIA/RE – Bryn Eryr Uchaf, Menai Bridge - Full application for the erection of three 800kW – 900kW wind turbines with a maximum hub height of up to 55m, rotor diameter of up to 52m and a maximum upright vertical tip height of up to 81m, the improvements to the existing access to the A5025 road together with the erection of 3 equipment housing cabinets on land at Bryn Eryr Uchaf, Menai Bridge.

 

It was RESOLVED to defer consideration of the application in accordance with the Officer’s recommendations for the reasons outlined in the written report.