Decision details

Applications that will be Deferred

Decision Maker: Planning and Orders Committee

Decision status: Recommendations Approved

Is Key decision?: No

Is subject to call in?: No

Decision:

6.1  20LPA962/CC – Retrospective application for the recently constructed track together with improvements to the existing access on land opposite Fron Heulog, Cemaes

 

RESOLVED that a site visit be undertaken in accordance with the request of the Local Member.

 

6.2  41C8C – Full application for the change of use of land for the siting of 33 touring caravans, erection of a toilet block, construction of a vehicular access together with landscaping at Garnedd Ddu, Star

 

RESOLVED to defer consideration of the application at the request of the Officers.

6.3  46c427K/TR/EIA/ECON A hybrid planning application proposing :- Outline planning application, with all matters reserved except for means of access proposing: a leisure village at Penrhos Coastal Park, London Road, Holyhead comprising up to 500 new leisure units including new lodges, cottages and conversion of the existing estate buildings; central new hub building comprising reception, leisure facilities including indoor water park, ten pin bowling and indoor sports hall and cafes, bars, restaurants and retail; refurbishment and extension of estate buildings to provide central farmer’s market, indoor children’s play area, cycle and sports hire centre, spa with gymnasium and changing facilities, the boathouse ruins for new café and watersports centre, and the bathing house to become a new beachside restaurant; providing and maintaining 29 hectares of publicly accessible areas with public car parking and enhancements to the coastal path, including managed walkways within 15 hectares of woodland, the retention and enhancement of Grace’s pond, Lily pond, Scout’s pond with viewing platforms, the pet cemetery, war memorial, the pump house and picnic area with bird feeding stations and hides with educational and bilingual interpretation boards created throughout; creation of a new woodland sculpture trail and boardwalks and enhanced connection  to the coastal path; retention of public access to the beach and shallow coastal waters and a combined heat and power centre. The erection of leisure village accommodation and facilities which could be used initially as a temporary construction workers accommodation complex for Wylfa B at land at Cae Glas, Parc Cybi, Holyhead comprising: up to 315 lodges to be initially sub-divided to accommodate up to 2,000 construction workers; central hub building providing reception and canteen ancillary to accommodation; a park and ride facility comprising up to 700 car parking spaces; a new hotel; a lakeside hub comprising restaurant, café, retails and bar; new grass football pitch and cricket pitch; and a combined heat and power centre. to be subsequently converted (post Wylfa B construction) into a high quality extension to the Penrhos Coastal Park leisure village comprising refurbished lodges and facility buildings to create a high quality holiday accommodation (up to 315 family lodges); a visitor centre and nature reserve allowing controlled public access; and heritage centre with visitor parking. A residential development comprising up to 360 residential dwellings set in landscaping and open spaces at land at Kingsland, Kingsland Road, Holyhead. Each phase of development will have ancillary development comprising car parking, servicing areas, open spaces and plant at Penrhos Coastal Park, Cae Glas and Kingsland, Holyhead.

 

RESOLVED to defer consideration of the application as consultations and notifications are being collated and it is anticipated that a report on the planning application will be presented to the next meeting of the Planning and Orders Committee on 31 July, 2013.

Publication date: 09/07/2013

Date of decision: 03/07/2013

Decided at meeting: 03/07/2013 - Planning and Orders Committee

Accompanying Documents: